Fund Pub reconstruction — $2.0M by Sept 1st!
Built in 1960 with modest materials and methods of the day, the structure now faces serious challenges. This is not a renovation — it’s a necessary reconstruction to preserve the character we love while securing the future.
Pub reconstruction cost breakdown
The MRG Facilities and Finance Committees, and Vermont Integrated Architecture, have thoroughly assessed the need and developed a plan that balances historic preservation, financial responsibility, and operational improvements.
- Structural integrity and longevity: The rebuild will be done with modern, durable materials that will address issues with load-bearing columns, beams and foundation gaps that allow water intrusion.
- Life safety and code compliance: Bringing the outdated and hazardous mechanical, electrical and plumbing systems up to code. including emergency exits, egress improvements, and system overhauls.
- Energy-efficiency and cost reduction: The roof will be rebuilt with insulation beyond code, which improves energy performance, reduces significant air leakage and heating costs.
- Operational improvements and enhanced guest experience: Redesigned layout to improve staff workflow, reduce hazards, and enhance functionality. The expanded windows will increase natural light and view along better acoustics to improve ambiance for music and conversation.
Also note that the project must comply with Act 250 and historic preservation mandates, adding complexity — but ensuring long-term safety and sustainability.
Let’s work together to rebuild the heart of our community.
We need to act fast!
We need to have the money raised by Sept 1st.
We can do it if we all contribute. Every skier. Every friend. Every contribution matters.
For your contribution…
[reward]
Quantities are extremely limited. We cannot guarantee availability, so these are first come, first served. Email contact@starkmountain.org to secure yours right away. Go go go!
Other ways to give
There are other ways to give, and we’re always available via email at contact@starkmountain.org — we’ll get back to you personally. Thank you!
Why it matters
Stark’s Pub has been the soul of our community for over 75 years. It’s where cold fingers wrap around warm mugs, where strangers become friends, and where generations of skiers have gathered to laugh, connect, and share stories after unforgettable days on the mountain. It’s where the MRG spirit comes alive.
Pub foundation issues led to the Basebox basement flooding, Feb 2022
However, time has taken its toll, and this cherished space is in critical need of reconstruction. Built in 1960 with modest materials and methods of the day, the structure now faces serious challenges. This is not a renovation — it’s a necessary reconstruction to preserve the character we love while securing the future.
- Safety at Risk: flooding, electrical hazards, failing beams
- Non-Compliant Systems: outdated plumbing, fire, heating
- Inefficient & Costly: wasted energy, constant fixes
Learn more about this opportunity on madriverglen.com/starks-pub-reconstruction/